在消防設備檢查中滅火設備定期檢查非常重要
It is very important to check the dry powder fire extinguishing equipment regularly in the fire fighting equipment inspection
月檢査內(nèi)容?1.檢査項目及周期 下列項目至少每月檢查1次。?干粉儲存裝置部件。?驅動氣體儲瓶充裝量。?2.檢査內(nèi)容 檢查干粉儲存裝置部件是否有碰撞或機械性損傷,防護涂層是否完好;銘牌、標志、鉛封應完好。 對二氧化碳驅動氣體儲瓶逐個進行稱重檢査。
The following items shall be checked at least once a month. Components of dry powder storage device. Drive gas bottle filling capacity. 2. Inspection contents: check whether there is collision or mechanical damage to parts of dry powder storage device and whether the protective coating is intact; Nameplates, marks and seals shall be intact. Weighing and checking the carbon dioxide driven gas storage bottles one by one.
季檢的內(nèi)容和要求 通過試驗閥對泵組式系統(tǒng)進行1次放水試驗,檢查泵組啟動、主備泵切換及報警聯(lián)動功能是否正常。 檢査瓶組式系統(tǒng)的控制閥動作是否正常。 檢查管道和支、吊架是否松動,管道連接件是否變形、老化或有裂紋等現(xiàn)象。
Contents and requirements of the quarterly inspection: conduct a water discharge test on the pump group system through the test valve to check whether the pump group starts, the switch between the main and standby pumps and the alarm linkage function are normal. Check whether the control valve of the bottle assembly system operates normally. Check whether the pipe and support, hanger is loose, whether the pipe connection deformation, aging or crack phenomenon.
(2)年檢的內(nèi)容和要求 定期測定1次系統(tǒng)水源的供水能力。 對系統(tǒng)組件、管道及管件進行1次全面檢查,清洗儲水箱、過濾器,并對控制閥后的管道進行吹掃。 儲水箱每半年換水一次,儲水容器內(nèi)的水按產(chǎn)品制造商的要求定期更換。 進行系統(tǒng)模擬聯(lián)動功能試驗,試驗內(nèi)容與要求詳見第四節(jié)第三部分。標準要求二氧化碳滅火器每年至少檢查一次,低于額定充裝量的95%就應進行檢修。 由于石油化工設備及受壓容器,在溫度應力、交變應力、介質(zhì)強烈腐蝕等惡劣條件的作用下,容易出現(xiàn)泄漏,造成火災和中毒事故。
(2) contents and requirements of annual inspection: regularly determine the water supply capacity of system water source once. Conduct a comprehensive inspection of the system components, pipes and fittings, clean the water storage tank and filter, and purge the pipes behind the control valve. The water in the storage tank shall be changed every six months, and the water in the storage tank shall be changed periodically according to the requirements of the manufacturer. Carry out the system simulation linkage function test. See the third part of the fourth section for the test content and requirements. Carbon dioxide fire extinguishers are required to be checked at least once a year. Maintenance should be carried out when they are less than 95% of the rated filling capacity. Due to the petrochemical equipment and pressure vessels, in the temperature stress, alternating stress, medium strong corrosion and other adverse conditions, easy to leak, resulting in fire and poisoning accidents
所以,每年都要作抽樣探傷,必要時,還要做100%的檢查。 在不影響古建筑外部結構的前提下,高大的古建筑物上應視地形地物需要,安裝避雷設施,并在每年雷雨季之前進行測試維修,保證完好有效。
Therefore, every year to do a sampling inspection, when necessary, but also to do 100 percent of the inspection. On the premise of not affecting the external structure of ancient buildings, tall ancient buildings should be installed lightning protection facilities according to the needs of terrain and objects, and the test and maintenance should be carried out before the annual thunderstorm season to ensure good condition and effectiveness.
(3)模擬啟動檢査。 2.檢査內(nèi)容 防護區(qū)的疏散通道、疏散指示標志和應急照明裝置、防護區(qū)內(nèi)和入口處的聲光報警裝置、入口處的安全標志及干粉滅火劑噴放指示門燈、無窗或固定窗扇的地上防護區(qū)和地下防護區(qū)的排氣裝置和門窗設有密封條的防護區(qū)的泄壓裝置。儲存裝裝置間的位置、通道、耐火等級、應急照明裝置及地下儲存裝置間機械排風裝置。 管網(wǎng),支架及噴放組件 干粉儲存容器的數(shù)量、型號和規(guī)格,位置與固定方式,油漆和標志,干粉充裝量,以及干粉儲存容器的安裝質(zhì)量。 集流管、驅動氣體管道和減壓閥的規(guī)格、連接方式、布置及其安全防護裝置的泄壓方向。
(3) simulate startup check. 2. Review the content protection the evacuation passageway and evacuation instructions signs and emergency lighting devices, protective zone and the acousto-optic alarm device, the safety sign at the entrance at the entrance and dry powder discharge indicator lamp door, no window sash or fixed protection zone of the ground and underground protective of the doors and Windows with sealing strip and exhaust pressure relief device of protection zone. Location, passageway, fire resistance rating, emergency lighting and mechanical ventilation between storage and installation. Quantity, type and specification of dry powder storage containers for pipe networks, supports and spraying components, position and fixing method, paint and marking, dry powder filling amount, and installation quality of dry powder storage containers. Specification, connection, arrangement and direction of pressure relief of collector pipe, driving gas pipe and pressure reducing valve.
?選擇閥及信號反饋裝置的數(shù)量、型號、規(guī)格、位罝、標志及其安裝質(zhì)量。 閥驅動裝置的數(shù)量、型號、規(guī)格和標志,安裝位罝,氣動閥驅動裝置中啟動氣體儲瓶的介質(zhì)名稱和充裝壓力,以及啟動氣體管道的規(guī)格、布置和連接方式。 管道的布罝與連接方式、支架和支吊架的位罝及間距、穿過建筑構件及其變形縫的處理、各管段和附件的型號規(guī)格以及防腐處理和油漆顏色; 噴頭的數(shù)量、型號、規(guī)格、安裝位置和方向。 滅火控制器及手動、自動轉換開關,手動啟動、停止按鈕,噴放指示燈、聲光報警裝置等聯(lián)動設備的設置。
Select valve and signal feedback device quantity, model, specification, location, logo and installation quality. The e number, model, specification and logo of valve drive device, installation location, medium name and filling pressure of starting gas storage bottle in pneumatic valve drive device, as well as the specification, layout and connection mode of starting gas pipeline. Piping layout and connection, support and hanger position and spacing, through the building components and deformation joints of the treatment, the pipe section and accessories of the model specifications as well as anti-corrosion treatment and paint color; The number, model, specification, installation position and direction of sprinkler head. Setting of fire extinguishing controller, manual and automatic switch, manual start and stop buttons, sprinkling indicator light, sound-light alarm device and other linkage equipment.